All tools

Voltatic calculator

AC or DC? Charger planner.

Answer four quick questions about where cars park and how long they stay. See whether AC or DC fits, how many chargers you need and the power to plan for.

1 Where will cars charge?
2 How long is a car usually parked?
3 How much range should each car get?
4 Cars charging per day
Best fit for this siteAC 11 kW

To add 100 km in 2 hours, a car needs about 7.9 kW. 11 kW AC covers that, and AC is the simpler install. Many cars in India only take 7.4 kW AC — confirm the vehicle.

View the 7.4–21 kW AC range charger
Chargers
3
Connected load
≈ 33 kW
Time per car
1 h 27 min
Sales / month
₹1.3 lakh

What each charger adds in 2 hours

  • 7.4 kW AC93 km
  • 11 kW AC 1 h 27 min
  • 22 kW AC 43 min
  • 30 kW DC 34 min
  • 60 kW DC 17 min
  • 120 kW DC 8 min
Get a site check

Planning estimate: about 7 km per kWh, 10–15% losses, sales at ₹20/kWh before costs. Assumes the car takes the charger's full power; many cars in India take 7.4 kW AC and 50–60 kW DC. Confirmed after a site survey.

Need a real-world quotation?

Use the result as a starting point.

Share your site details with Voltatic. Final product suitability and installation costs should be confirmed from the actual vehicle, datasheet and site conditions.

Request a quotation
WhatsApp us