Free calculators · no sign-up

Put your own numbers to work.

Not sure where to start? Begin with “AC or DC?” — four taps tell you which charger fits. Every result updates as you go and can be shared with Voltatic on WhatsApp.

Which charger fits my site?

AC or DC? Charger planner

Answer four quick questions about where cars park and how long they stay. See whether AC or DC fits, how many chargers you need and the power to plan for.

Full calculator
1 Where will cars charge?
2 How long is a car usually parked?
3 How much range should each car get?
4 Cars charging per day
Best fit for this siteAC 11 kW

To add 100 km in 2 hours, a car needs about 7.9 kW. 11 kW AC covers that, and AC is the simpler install. Many cars in India only take 7.4 kW AC — confirm the vehicle.

View the 7.4–21 kW AC range charger
Chargers
3
Connected load
≈ 33 kW
Time per car
1 h 27 min
Sales / month
₹1.3 lakh

What each charger adds in 2 hours

  • 7.4 kW AC93 km
  • 11 kW AC 1 h 27 min
  • 22 kW AC 43 min
  • 30 kW DC 34 min
  • 60 kW DC 17 min
  • 120 kW DC 8 min
Get a site check

Planning estimate: about 7 km per kWh, 10–15% losses, sales at ₹20/kWh before costs. Assumes the car takes the charger's full power; many cars in India take 7.4 kW AC and 50–60 kW DC. Confirmed after a site survey.

Have a specific project?

Some sites need more than a quick calculation.

Fleet depots, hotels and highway locations need a closer look at electrical supply, parking, energy demand and project scope.

Discuss a project
WhatsApp us