This guide provides general information. Confirm the exact vehicle, charger datasheet, site conditions and current local requirements before purchase or installation.
Sanctioned load is not the same as spare load
A property can have a sanctioned load that is partly used by existing equipment. The charger load should be considered alongside actual peak demand, other large appliances and the operating schedule.
Why phase and protection matter
Single-phase and three-phase supplies have different constraints. Cable sizing, protective devices, earthing, voltage drop and protection coordination must be designed for the specific charger and installation conditions.
When to speak to the DISCOM or an electrician
If the available load is insufficient, a load enhancement or connection change may be needed. A qualified electrical professional should confirm this with the relevant DISCOM before equipment is installed.
Plan your next step with Voltatic