This guide provides general information. Confirm the exact vehicle, charger datasheet, site conditions and current local requirements before purchase or installation.
Map the parking and meter arrangement
The first questions are where the vehicle parks, where its electricity meter or distribution board is located and how a cable can reach the parking bay. A shared basement often needs a different plan from an open assigned parking space.
Coordinate with the society
Residents should understand the proposed cable path, common-area use, protection, metering and maintenance responsibility. The building's own rules and applicable local requirements should be checked before installation.
- Confirm parking entitlement and permissions
- Identify the meter and proposed supply route
- Document the installation and protection plan
- Clarify future access and maintenance
Think about future demand
If several residents may install chargers, the society should assess common electrical capacity and whether a phased infrastructure plan is more practical than independent work by each resident.
Plan your next step with Voltatic
Use the AC or DC planner or the installation cost estimator to organise your requirements. Share your city and site details when requesting a quotation.